Schedulability Test for Multiprocessor Scheduling Based on Hyperbolic Bound
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The utilization bound for multiprocessor systems using the rate-monotonic scheduling algorithm and first fit allocation policy proposed by Lopez, et al. offers the best performance among all O(m) complexity schedulability tests. In this paper, a utilization bound is derived for the same target problem. The main difference between these two bounds lies in the technique to verify the schedulability of task sets on uniprocessors; the schedulability test here is performed based on the hyperbolic bound proposed by Bini, et al. The new bound surpasses the existing one under quite a lot parameter settings, and the combination of these two schedulability test methods, which are compatible with each other, can significantly improve the number of schedulable task sets with little extra overhead.

    Reference
    Related
    Cited by
Get Citation

王洪亚,尹伟,宋晖,徐立群,王梅.基于双曲线边界的多处理器实时任务可调度性判定.软件学报,2012,23(8):2223-2234

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 17,2011
  • Revised:November 03,2011
  • Adopted:
  • Online: August 07,2012
  • Published:
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-4
Address:4# South Fourth Street, Zhong Guan Cun, Beijing 100190,Postal Code:100190
Phone:010-62562563 Fax:010-62562533 Email:jos@iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063