Minimizing Total Weighted Completion Time on Parallel Unbounded Batch Machines
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper considers the problem of scheduling n jobs on m parallel unbounded batch machines to minimize the total weighted completion time. Each job is characterized by a positive weight, a release time and a processing time. Each unbounded batch machine can process up to B (Bn) jobs as a batch simultaneo usly. The processing time of a batch is the longest processing time among jobs in the batch. Jobs processed in the same batch have the same completion time, I.e., their common starting time plus the processing time of the batch. A polynomial time approximation scheme (PTAS) for this problem is presented.

    Reference
    Related
    Cited by
Get Citation

李曙光,李国君,王秀红.极小化加权完工时间和的无界批量机器并行调度问题.软件学报,2006,17(10):2063-2068

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 08,2004
  • Revised:July 08,2005
  • Adopted:
  • Online:
  • Published:
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-4
Address:4# South Fourth Street, Zhong Guan Cun, Beijing 100190,Postal Code:100190
Phone:010-62562563 Fax:010-62562533 Email:jos@iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063