Directed Hypergraph Based and Resource Constrained Enterprise Process Structure Optimization
Affiliation:

  • Article
  • | |
  • Metrics
  • |
  • Reference [14]
  • |
  • Related [20]
  • |
  • Cited by [1]
  • | |
  • Comments
    Abstract:

    To improve the practicability and rationality of enterprise process structure optimization, an optimizing method based on directed hypergraph and resource constraint is presented. It models the resource-added process by a directed hypergraph. Based on the directed hypergraph theory and the process meaning added to the hypergraph, the process-structure-optimizing problem is transformed into the directed hypergraph cutting problem, and a set of formal optimizing rules of the process is given too. Then a process whose structure and supporting resource are optimized is obtained. Finally, an example is given to prove the feasibility and effectiveness of this method.

    Reference
    [1]Huang LH,Qian N,Ge YL,Hu J.The optimization rules and methods of business process.High Technology Letters,1997,7(11):26-32 (in Chinese with English abstract).
    [2]Tan WA,Zhou BS,Li MS,Wang Q.Research on simulation-based auto-optimized technique in enterprise process model.Journal of Software,2002,13(4):706-712 (in Chinese with English abstract).http://www.jos.org.cn/1000-9825/13/706.htm
    [3]Dewan R,Seidmann A,Walter ZP.Workflow optimization through task redesign in business information processes.Collaboration Systems and Technology Track,1998,1(1):240-252.
    [4]Brickley JA,Jr Smith CW,Zimmerman JL.Managerial Economics and Organizational Architecture.2nd ed.Beijing:Tsinghua University Press,2001.
    [5]Aldowaisan TA,Gaafar LK.Business process reengineering:an approach for process mapping.The Int'l Journal of Management Science,1999,27(5):515-524.
    [6]Xu G.The research of model-based enterprise process optimization methods [Ph.D.Thesis].Harbin:Harbin Institute of Technology,2002 (in Chinese with English abstract).
    [7]Seidmann A,Sundararajan A.The effects of task and information asymmetry on business process redesign.Int'l Journal of Production Economics,1997,50:117-128.
    [8]Ouyang LY,Chen CK,Chang HC.Quality improvement,setup cost and lead-time reductions in lot size reorder point models with an imperfect production process.Computers & Operations Research,2002,29(12):1701-1717.
    [9]Mousavi A,Adl P,Rakowski RT,Gunasekaran A.Design of a production planning system using customer oriented design and resource utilisation (CODARU).Int'l Journal of Advanced Manufacturing Technology,2001,17(11):805-809.
    [10]Sun XD,Xu XF,Wang G.Resource-Based trade-off model for multi-objective of process.Computer Integrated Manufacturing System,2004,10(6):667-671 (in Chinese with English abstract).
    [11]Babu AJG,Suresh N.Project management with time,cost and quality considerations.European Journal of Operational Research,1996,88(2):320-327. [1]黄丽华,钱宁,葛永利,胡健.企业过程优化的规则和方法.高技术通讯,1997,7(11):26-32.
    [2]谭文安,周伯生,王强,李明树.基于模拟的企业过程模型自动优化技术研究.软件学报,2002,13(4):706-712.http://www.jos.org.cn/1000-9825/13/706.htm
    [6]徐罡.基于模型的企业过程优化方法的研究[博士学位论文].哈尔滨:哈尔滨工业大学,2002.
    [10]孙雪冬,徐晓飞,王刚.基于资源的过程多目标折衷优化.计算机集成制造系统,2004,10(6):667-671.
    Comments
    Comments
    分享到微博
    Submit
Get Citation

孙雪冬,徐晓飞,王刚.基于有向超图的资源约束下企业过程结构优化.软件学报,2006,17(1):59-68

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 21,2005
  • Revised:August 15,2005
You are the first2045182Visitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-4
Address:4# South Fourth Street, Zhong Guan Cun, Beijing 100190,Postal Code:100190
Phone:010-62562563 Fax:010-62562533 Email:jos@iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063