Process Migration for the Network of Workstations
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Process migration is an important tool on NOWs (network of workstations) for load-balancing and high availability. In this paper, the authors present a log-based approach to provide process migration for parallel applications. Because this approach is implemented on top of PVM (parallel virtual machine), it is transparent to users and portable. This approach has been used in the ChaRM (checkpointing-based rollback recovery and process migration system) system. The experiments show that the overhead is low.

    Reference
    Related
    Cited by
Get Citation

裴 丹,汪东升,沈美明.工作站网络系统进程迁移机制.软件学报,1999,10(10):1032-1037

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 20,1998
  • Revised:October 09,1998
  • Adopted:
  • Online:
  • Published:
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-4
Address:4# South Fourth Street, Zhong Guan Cun, Beijing 100190,Postal Code:100190
Phone:010-62562563 Fax:010-62562533 Email:jos@iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063