Method of Response-Time Analysis for Mixed Criticality Systems
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In mixed criticality systems, tasks with different criticality levels share a common platform, which makes the schedulability more complex. Considering AMC (adaptive mixed criticality) scheduling is currently the most effective fixed priority approach for scheduling mixed criticality systems, this work presents a response time analysis algorithm AMC-PM (AMC partition max) for AMC. In AMC-PM, the WCET (worst case execution time) of the task is partitioned into low critical execution time and high critical execution time. Then an upper bound of response time can be derived by adding the response times of the two parts together. For tasks with small WCET, evaluations illustrate that AMC-PM can significantly enhance the schedulability comparing with AMC-rtb and that AMC-PM can effectively decrease the run time comparing with AMC-max.

    Reference
    Related
    Cited by
Get Citation

白恩慈,张伟哲.一种计算混合关键任务响应时间的方法.软件学报,2015,26(S2):257-262

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 07,2015
  • Revised:October 12,2015
  • Adopted:
  • Online: January 11,2016
  • Published:
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-4
Address:4# South Fourth Street, Zhong Guan Cun, Beijing 100190,Postal Code:100190
Phone:010-62562563 Fax:010-62562533 Email:jos@iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063